[Detailed design for improvement of a sewer of Nangok interchange ]
06.10.23 ~ 06.11.21 / Gwanak ward office
¡Ü Sambo has implemented a improvement of a sewer as followings.
- Decrepitization of a sewer facility that is placed at Nangok intercahge of #8,4,11 Sinrim-dong, Gwanak-Gu
- Function of pulling over a sewage
¡Ü Scope of the project is as follows
- Total Length : 0.74km
- Length of Sewer (Hum-type pipe : D600~D1200mm) : 0.65km
- Sewage and rain-water linking pipe
(Polyethylene double layer pipe : D200mm) : 0.09km
- 18ea Manhole, 19ea rain-water stop-log
¡Ü The purpose of this project is to lead a hygienic and pleasant city-life, and prepare for a flooding damage
|