[Detailed Design for Widening of Gapan - San Fernando - Olongapo (GSO) Road Including Sta. Cruz Bridge and Emergency Pilot Dredging of Porac - Gumain River]
2007.07 ~ 2008.01 / Ministry of Public Works and Highways, the Philippines


¡Û Road: Length 18 km, width 16.4 m (4 lanes), design speed 80 km/h
¡Û Bridge: Length 280 m, width 9.45 m (2 lanes), type PC Girder
¡Û Dredging: Length 8 km, width 100 m, depth 2 m
¡Û Financing: Korean Economic Development Cooperation Fund (EDCF)

¢¸¢¸ Back ¤Ó Next ¢º¢º