[Samcheonpo - Sacheon-1 National Road Construction, Comprehensive Construction Supervision]
|
CLIENT : Busan Regional Land Management Office
Project Description
- L=7.9 km, B=19.5 m (4 lanes)
- Bridges: L=670 m/5
Songpo 1st Bridge (STEEL BOX girder bridge) L=555.0 m, B=20.5 m, longest span 60 m
-Tunnels: Gagsan Tunnel L=1,405 m (Samcheonpo direction 695 m, Sacheon direction 710 m, both directions 2 lanes built with NATM)
Contract Amount : 4,493,000 USD
Contract Period : 2003.11.17 ~ 2008.09.13
|
|
[Saengbiryang - Ssangbaek National Road Widening Construction, Comprehensive Construction Supervision]
|
CLIENT : Busan Regional Land Management Office
Project Description
- L=11.2 km, B=20.0 m (4 lanes)
- Bridges: 11, L=1,045 m
- Steel bridge (STEEL BOX) L=660 m/4, PSC BEAM bridge L=300 m/4
- Tunnels: L=1,111 m/2 (NATM)
Contract Amount : 4,493,000 USD
Contract Period : 2003.11.17 ~ 2008.09.13
|
|
[Hwangsan Bridge Construction, Comprehensive Construction Supervision ]
|
CLIENT : Gumi City
Project Description
- Bridges: L=350 m, width B=11 m, Steel bridge
Contract Amount : 300,000 USD
Contract Period : 2003.04.07 ~ 2007.12.31
|
|
[Dancheon Bridge Flood Damage Rehabilitation, Comprehensive Construction Supervision]
|
CLIENT : Andong City
Project Description
- Bridge construction (P/F composite bridge): 401.5 m/2
Tancheon Bridges: length 184 m, width 7.5 m, longest span: 46 m
Woncheon Bridges: length: 217.5 m, width: 7.5 m, longest span: 43.5 m
Contract Amount : 150,000 USD
Contract Period : 2003.01.02 ~ 2003.11.08
|
|