[Pre-Feasibility Study for Busan Bukhang Port and Cheonma Tunnel Support Project]
06.01.10 ~ 06.06.25 / Korea Development Institute


  • The project aims to strengthen national competitive strength by reducing transportation costs of the Busan Bukhang Port, to be completely operational in 2011, which will require a road connection with the existing Busan Port. In addition, this road should be constructed early enough to enable transportation sufficient capacity.

  • The project section was located between the southern and western districts of Busan Metropolitan City, and had a total length of 9.29km. Main structures on the section include Bukhang Grand Bridge (length 3.33km), Yeongdo Overpass (length 2.44km), Gamcheon overpass (length 1.44km), and Cheonma Tunnel (length 1.06km)