[ Pre-Feasibility study for Phase 2 of Seoul Subway Line No. 9 ]
05.05.18 ~ 05.07.30 / Korea Transport Institute
Phase 2 for the Seoul Subway Line No. 9 seeks to fulfill 3 objectives. First, it seeks to alleviate the congestion on the Subway Line No. 2 Jamsil - Samsung - Sillim section. Second, it seeks to improve the operation efficiency of the Phase 1 of Line No. 9 (Gangnam - Gimpo Airport). And third, it seeks to connect Incheon International Airport with Gimpo and Ilsan New Towns.
Sambo Engineering performed the pre-feasibility study for Korea Transport Institute as part of the economic and financial feasibility study commissioned by the Korea Development Institute
|