Pre-Feasibility Study for Yeoju - Chungju Double Track Railway Construction Korea Development Institute / 2002. 3. 7 ~ 2002. 6.30

  • This project would link the Seongnam - Yeoju double track railway with Chungbuggwon Station, which is further linked to Seoul and Gyeonggi Province. Total length of the route is 43.0km, and Sambo Engineering carried out the pre-feasibility study.

  • The route will further link with the Seongnam - Icheon - Yeoju double track railway (currently under basic and detailed design) ending point, as well as the provide access to the region around the cities of Yeoju - Chungju - Mungyeong - Gimcheon - Jinju.
  • ¢¸¢¸ Back ¤Ó Next ¢º¢º