[ Basic and Detailed Design for improvement of access ramp of Hannam Grand Bridge ]
07.03.14 ~ 07.10.10 / Seoul City

¡Û This service is intended to make structural improvement of access ramp to bridge. Because length of ramp in north side to Hannam Grand Bridge is too short, so that to access is difficult. While in ramp of south side, traffic flow is complicated because entering car access from Olimpic road to Kyeongbu highway and lane are overlapped.
¡Û Location
  -North part : Hannam-Dong, Yongsan-Gu
  -South part : Apgujeong-Dong, Gangnam-Gu
¡Û Scale
  -North part : Width : 7.65m, Length:150m(Br.)
  -South part : Width : 4.60m, Length:700m(Earth work)

¢¸¢¸ Back ¤Ó Next ¢º¢º