[ Feasibility Study for Yeoju~Manjong in Yeongdong Highway ]
04.11.19 ~ 05.12.14 / Korea Expressway Corporation


¡Û This project is intended to be widening road from 4lanes to 6lanes between Yeoju JCT and Manjong JCT section(35.3km) of Yeongdong Highway. Nowadays due to 5 working days in a week, tourism demand to Gangwon province and traffic volume are increasing. So, we need to solve traffic congestion, traffic accident because of structural insufficiency. Therefore, this project is intended to cope with that problem

¡Û Total Length : 35.3km, width : 30.6m(6lanes), Design speed : 100km/h

¡Û Main structures : Tunnel-Gangcheon 1,2 Tunnel, Bridge-Namhangang Br.,Jijeong Br.(PSC BOX, ILM)

¢¸¢¸ Back ¤Ó Next ¢º¢º