[Feasibility Study and Basic Planning for Sosa~Wonsi Double Track Railway]
2003.02.14 ~ 2003.12.10 / Korea Railway Corporation


This project is planed to cope with increasing of transport demand due to development of new port and Industrial area also to provide traffic conveniences for local resident in Ansan, Siheung, Bucheon region.
This project is settled to increase traffic convenience and efficiency of railway operation due to construct railway which correspond with characteristic and function of alignment. And in long-term, it establish traffic system in connect with wide railway.
Project section is Bucheon, Siheung, Ansan region, total 24.7km. And scope of basic planning is that geological investigation, survey, plan of structures, operation plan, environmental review, traffic status study, traffic demand modeling, financial analysis, feasibility evaluation as well.

¢¸¢¸ Back ¤Ó Next ¢º¢º