Detailed Design for Songgan~Baekun Road Widening and Pavement
¡Û Songgang~Baekun section of NR No.38 is main road to onnect between Chungju, Janghowon and Jecheon, Yeongwol
¡Û But, its capacity of 2 lanes is exceeded due to increase traffic volume steadily because of Chungju
Lake, Wolak Mt. Ntional Park and Danyang 8 scenary.
¡Û Therefore, this project has purpose to carry out detailed design which is needed to construct all
of necessary items for widening and pavement and to provide local resident for traffic convenience
and increase of revenue.
¡Û Total length is 9.96km, design speed is 80km/h and Darijae tunnel,1.5km, and long bridge,235m
are included in this section
|