[Basic Design for Approach Road to Yeosu National Industrial Area, Lot 4 (Turnkey)]
06.04.28 ~ 06.12.26 / Kolon Construction


This project aim to construct a road which will link Yeosu ~ Myo island ~ Gwangyang. It is expected to reduce transport costs by shortening travel time. The project is designed as a design-construction package bid.
Total length of Lot 4 in this project is 1.075km and most of the section is bridge above sea. In addition, with consideration of traffic volume and traffic flow, an interchange type which can be constructed step by step was selected. Safety was ensured by reducing speeds.

The main bridge body type is PSC Box Girder with strut, which has good aesthetic characteristics, and can be constructed with high quality concrete.

¢¸¢¸ Back ¤Ó Next ¢º¢º