[Basic Design for Approach Road to Yeosu National Industrial Area, Lot 1 (Turnkey)]
06.04.28 ~ 06.10.26 / GS Construction
This project aim to construct a road which will link Yeosu ~ Myo island ~ Gwangyang. It is expected to reduce transport costs by shortening travel time. The project is expected to be completed by 2012.
The project is consists of one section, Lot 1 (L=1.945km), of the total construction project (4 lots L=8.547km). For this project, Sambo formed a consortium with GS construction. The design for the approach bridge (L=650m), approach IC bridge (2ea, L=498m) were carried out by Sambo Engineering, and the cable-stayed bridge (L=760m) was designed by Yushin.
The cable-stayed bridge (main body L=430m, steel composition with symmetrical type) is designed to maximize sens of openness, dynamism, strength by application of a vertical main tower. In addition, it is secured with a limit of 300m¡¿52m, which allows for ships up to 4,000TEU to pass the bridge.
|