[Design for Alternative Bid for Yeongduck~Osan Road (Provincial Road No. 311)]
06.05.25 ~ 06.07.31 / Dongbu Construction


This project aims to solve traffic congestion and implement an urban development plan. The section of this project includes 1 bridge (L=1,270m), 2 tunnels (L=1,625m) and 2 arch (L=225m). Total road length is 3.3km with 6 lanes.

The route passes Kyonghee University (Suwon Campus), Singal Lake, and the Samsung Semiconductor factories in Giheung.

The section which passes the lake is designed as a Double Warren type of Nielsen Arch bridge, L=70m, in consideration with Giheung Lake Park plan. With that, the bridge ensured competitive power and good aesthetics.

¢¸¢¸ Back ¤Ó Next ¢º¢º